Process Data set: Ecocem CEM III/A (en) en

Key Data Set Information
Location IE
Geographical representativeness description Ireland
Reference year 2019
Name
Ecocem CEM III/A
Technical purpose of product or process Ecocem is a (latent) hydraulic binder produced by grinding granulated blast furnace slag (GBS). After grinding it becomes GGBS that conforms with the EN 15167 standard. This product is called “Ecocem”. Ecocem is an “inter- mediate” product, i.e. a constituent for the production of concrete, as well as mortar, masonry mortar, and other cementitous-bound materials. Concrete producers determine the proportions of binders used (ordinary cement and Ecocem), so they are able to apply the optimal mix. This means that the use of Ecocem will vary with the intended application and requirements of the final concrete product. Besides producing Ecocem (GGBS), Ecocem Ireland also produses two different mixes of Ecocem and Portland cement. Ecocem CEM III/A contains up to 65% GGBS. Ecocem CEM III/C contains up to 95% GGBS. Ecocem CEM III/A. Ecocem is made only from GBS. Blast furnace slag (BS) is a residual portion of the reaction between the raw materials: iron ore, coal and limestone, as schematically illustrated in Figure 2. In the blast furnace, the iron ore is heated to about 1500 ° C. In the melt that is formed, the heavier molten iron sinks to the bottom and the remaining materials, mostly molten limestone, which forms the slag, are tapped off. The molten slag is then rapidly cooled under high pressure water jets, a process called quenching, where it is cooled into small granular pieces. This resulting product is granulated blast furnace slag (GBS). The GBS is imported to Ecocem’s plant from different locations throughout Europe. At the production facility in Dublin, the various slags are pre-mixed in the storage yard before milling, to ensure a consistent quality. When the GBS is pre-mixed, it is transported with a shovel and fed into a hopper at the production facility is (Figure 2 right side). At this time, the GBS still contains about 10% moisture. By means of a gas dryer, this mois- ture is evaporated from the GBS which is then fed into the ball mill to be ground until it reaches the appropri- ate fineness. In the separator, the fine particles that meet the required fineness are separated and discharged into the storage silo. At this stage the product is a ground GBS, referred to as GGBS (ground granulated blast furnace slag). Ground material that is still too coarse is fed back into the ball mill to be ground further. From the storage silo the Ecocem product (GGBS) is ready to be transported to the customer. To create Ecocem CEM III/A and Ecocem CEMIII/C is blended with CEM I Portland cement.
General comment on data set Data flows have been modeled as realistically as possible. Data quality assessment is based on the principle that the primary data used for processes occurring at the production site is selected in the first instance. Where this is not available, other reference data is selected from appropriate sources. The dataset is representative for the production processes used in 2017. The process descriptions and quantities in this study are reproducible in accordance to the reference standards that have been used. The references of all sources, both primary and public sources and literature, have been documented in the LCA report. In addition, to facilitate the reproducibility of this LCA, a full set of data records has been generated which can be accessed via the EcoChain tool. This data portfolio contains a summary of all the data used in this LCA, and correspondingly, in the Ecocem Ireland EcoChain account.
Copyright Yes
Owner of data set
Quantitative reference
Reference flow(s)
Time representativeness
Data set valid until 2024
Time representativeness description "31.01.2019" - "31.01.2024"
Technological representativeness
Technology description including background system A1. Raw materials supply This module considers the extraction and processing of all raw materials and energy which occur upstream to the Ecocem manufacturing process, as well as waste processing up to the end-of waste state. A2. Transport of raw materials to manufacturer This includes the transport distance of the raw materials to the manufacturing facility via road, boat and/or train. A3. Manufacturing This module covers the manufacturing of Ecocem Products and includes all processes linked to production such as, mixing, packing and internal transportation. Use of electricity, fuels and auxiliary materials used during production is taken into account as well. Electricity has been purchased from Bord Gais based on wind certificates MPRN 10018873108

Indicators of life cycle

IndicatorDirectionUnit Raw material supply
A1
Transport
A2
Manufacturing
A3
Use of renewable primary energy (PERE)
Input
  • 281
  • 1.1
  • 5.02
Use of renewable primary energy resources used as raw materials (PERM)
Input
  • 0
  • 0
  • 0
Total use of renewable primary energy resource (PERT)
Input
  • 281
  • 1.1
  • 5.02
Use of non renewable primary energy (PENRE)
Input
  • 2.11E+3
  • 85.9
  • 0.273
Use of non renewable primary energy resources used as raw materials (PENRM)
Input
  • 0
  • 0
  • 0
Total use of non renewable primary energy resource (PENRT)
Input
  • 2.11E+3
  • 85.9
  • 0.273
Use of secondary material (SM)
Input
  • 0
  • 0
  • 0
Use of renewable secondary fuels (RSF)
Input
  • 0
  • 0
  • 0
Use of non renewable secondary fuels (NRSF)
Input
  • 0
  • 0
  • 0
Use of net fresh water (FW)
Input
  • 18.2
  • 0.00468
  • 0.000174
Hazardous waste disposed (HWD)
Output
  • 0.0106
  • 0.000593
  • 0.00000448
Non hazardous waste dispose (NHWD)
Output
  • 8.55
  • 4.82
  • 317
Radioactive waste disposed (RWD)
Output
  • 0.00927
  • 0.000543
  • 6.66E-7
Components for re-use (CRU)
Output
  • 0
  • 0
  • 0
Materials for recycling (MFR)
Output
  • 0
  • 0
  • 0
Materials for energy recovery (MER)
Output
  • 0
  • 0
  • 0
Exported electrical energy (EEE)
Output
  • 0
  • 0
  • 0
Exported thermal energy (EET)
Output
  • 0
  • 0
  • 0

IndicatorUnit Raw material supply
A1
Transport
A2
Manufacturing
A3
  • 1.87E+3
  • 84.4
  • 0.293
  • 1.01
  • 0.0387
  • 8.92E-7
  • 0.95
  • 0.0266
  • 0.000197
  • 0.128
  • 0.00518
  • 0.0000481
  • 4.5E+2
  • 5.23
  • 0.0252
  • 0.0000142
  • 9.63E-7
  • 1.27E-9
  • 0.036
  • 0.000966
  • 0.0000227